How long does it take to build a Padel court?
Once the foundation work is completed, it usually takes 1 to 2 weeks to install a Padel court, depending on the court type, site readiness, and project complexity.
What are the basic foundation requirements for a Padel court?
The court foundation is crucial. It must be solid, level, and have good drainage. A typical outdoor court requires a concrete base of at least 20–25 cm thick, with a smooth and even surface. Proper groundwork is especially important for outdoor courts to prevent sinking or water accumulation.
Do you provide installation services?
Yes, we offer professional installation guidance. To ensure high-quality construction, we can send experienced engineers to your site to provide: Technical guidance Supervision of the installation process Support for key installation steps and final inspection Please note: Clients are responsible for the engineer’s travel, accommodation, meals, and visa costs. Alternatively, we can recommend a local installation team to assist you. Our goal is to ensure every court project is delivered smoothly and to the highest standard.
How much does it cost to build a Padel court?
The cost of a Padel court varies depending on several factors, including the court type (standard or panoramic), materials, customization needs, site preparation, and location. We recommend contacting us for a personalized quote.
How is a Padel court maintained?
Maintenance is relatively straightforward. Regular tasks include cleaning the artificial turf, removing debris and infill, checking the glass and metal structures, tightening screws, and ensuring proper drainage. We provide a detailed maintenance guide and optional maintenance services.